PLEXUS EXAMPLE · 08
Equipment list vs datasheets
Six equipment items cross-checked across the register, two datasheets and the BoD: materials, duties and design conditions aligned, conflicts flagged.
Input
Master Tag Registers, Equipment sheet
- Revision
- Rev 0
- Items
- 6
- Scope
- ACD-300-001 area
Basis of Design & Operation/Control Philosophy
- Revision
- Rev 0
- Sections
- 2.3, 3.6, 3.7
- Used for
- Duties, margins, materials
The source documents are not shown: registers and datasheets stay inside your project. The cross-check below runs on a hypothetical plant (ACD), presented the way consistency results arrive.
What Plexus does
- 01Reads the equipment register, both datasheets and the BoD into one structure.
- 02Aligns each item across documents: allocation, materials, key data and design conditions.
- 03Marks each result pass, conflict or check.
- 04Flags the conflicts; the engineer confirms which document governs.
Output
This animation illustrates the Plexus workflow on a hypothetical plant (ACD). In the product, cross-checks run server-side and every value keeps provenance to its source document; an engineer reviews and confirms.
Source documents: ACD-REG-0001 Equipment sheet, two datasheets and ACD-BOD-0001, hypothetical plant
| Equipment item | P&ID allocation | Materials | Key data and duty | Design conditions |
|---|---|---|---|---|
| E-301Feed/effluent exchanger | ||||
| E-302Effluent condenser (CW) | ||||
| E-303Effluent chiller (brine) | ||||
| V-301Cold separator | ||||
| T-301Off-gas scrubber | ||||
| P-301A/BScrubber circulation pumps |
Manual: 3-5 hours
With Plexus: 15-30 min review (estimate, six equipment items across register, datasheets and BoD)