PLEXUS EXAMPLES

Where Plexus saves engineering hours

Each example uses the hypothetical ACD acetone plant to show how source artifacts become structured, reviewable engineering work.

01

P&ID tag extraction

One P&ID sheet in, checkable registers out: equipment, instruments, valves and lines, with every value a reviewable candidate.

Input
One P&ID sheet (hypothetical plant ACD; the drawing itself is not shown)
Output
Equipment, instrument, valve and line registers, off-page connectors and items flagged for engineer review
Open example →
02

P&ID revision comparison

Rev 1 against Rev 0: every added, removed and modified tag listed with before and after values, checked against the registers.

Input
Two revisions of one P&ID sheet (hypothetical plant ACD; drawings not shown)
Output
Change register with carried-into-registers status and items needing engineer attention
Open example →
03

Pump datasheet vs offers

One datasheet, three offers: every parameter aligned, deviations marked, the bid tab ready for a decision.

Input
Pump datasheet for P-101A/B plus three vendor offers (hypothetical plant ACD, fictional vendors)
Output
Bid tabulation with per-parameter compliance and deviations flagged for engineer review
Open example →
04

Line register vs Basis of Design

Fifteen lines against three BoD rules: design pressure, design temperature and insulation checked, conflicts flagged for review.

Input
Line register for one P&ID sheet plus the BoD design rules (hypothetical plant ACD)
Output
Per-line rule evaluation with pass, conflict and check statuses and conflicts flagged for engineer review
Open example →
05

Pump RFQ generation

From datasheet to inquiry: a 40-line RFQ draft with every line traced to the datasheet or the BoD and open points flagged before issue.

Input
Pump datasheet for P-101A/B plus the BoD site and utility data (hypothetical plant ACD)
Output
RFQ draft with per-line provenance, proposed template defaults and open points for engineer review
Open example →
06

SIF register vs Basis of Design

Nine safety functions checked against the BoD: initiators, final elements, SIL targets and test basis, with conflicts flagged for review.

Input
SIF register plus the BoD safety-instrumented-function table (hypothetical plant ACD)
Output
Per-function evaluation with pass, conflict and check statuses and conflicts flagged for engineer review
Open example →
07

Alarm list vs instrument index

Twelve alarms checked against the instrument index and the alarm philosophy: orphans, range clashes and priority drift flagged for review.

Input
DCS alarm list for one P&ID sheet plus the instrument index and BoD alarm philosophy (hypothetical plant ACD)
Output
Per-alarm evaluation with pass, conflict and check statuses and conflicts flagged for engineer review
Open example →
08

Equipment list vs datasheets

Six equipment items cross-checked across the register, two datasheets and the BoD: materials, duties and design conditions aligned, conflicts flagged.

Input
Equipment register, two datasheets and the BoD (hypothetical plant ACD)
Output
Per-item cross-check with pass, conflict and check statuses and conflicts flagged for engineer review
Open example →
NEXT

More examples coming

Isometric vs P&ID checks and further register workflows will follow.