← All examples
Next examplePump datasheet vs offers →
PLEXUS EXAMPLE · 02
P&ID revision comparison
Rev 1 against Rev 0: every added, removed and modified tag listed with before and after values, checked against the registers.
Input
DOCUMENT REFERENCEACD-300-001
Effluent Cooling & Gas/Liquid Separation
- Revision
- Rev 0 (IFD)
- Sheet
- 1 of 1
DOCUMENT REFERENCEACD-300-001
Effluent Cooling & Gas/Liquid Separation
- Revision
- Rev 1 (AFD)
- Sheet
- 1 of 1
The source P&ID is not shown: client drawings stay inside your project. The registers below come from a hypothetical plant (ACD), presented the way extraction results arrive.
What Plexus does
- 01Aligns both revisions tag by tag: equipment, instruments, valves and lines.
- 02Lists every change with its before and after values.
- 03Checks each change against the current registers.
- 04Flags missed or partial carry-overs; the engineer confirms each one.
Output
0 / 10 changes foundrun first, then export
This animation illustrates the Plexus workflow on a hypothetical plant (ACD). In the product, revision alignment runs server-side and every change keeps provenance to both source documents; an engineer reviews and confirms.
Source documents: ACD-300-001 Rev 0 (IFD) and Rev 1 (AFD), hypothetical plant
| Tag | Class | Change | Field | Rev 0 | Rev 1 | Reason | Carried into registers |
|---|
Manual: 2-4 hours
With Plexus: 10-20 min review (estimate, hypothetical single-sheet exercise)