PLEXUS EXAMPLE · 06
SIF register vs Basis of Design
Nine safety functions checked against the BoD: initiators, final elements, SIL targets and test basis, with conflicts flagged for review.
Input
Safety Requirements Specification, SIF register
- Revision
- Rev A
- Functions
- 9
- Source
- SRS working copy
Basis of Design & Operation/Control Philosophy
- Revision
- Rev 0
- Section
- 6.5 Safety instrumented functions
- Basis
- IEC 61511, LOPA targets
The source documents are not shown: safety requirement specifications stay inside your project. The check below runs on a hypothetical plant (ACD), presented the way consistency results arrive.
What Plexus does
- 01Reads the SIF register and the BoD SIS table into one structure.
- 02Aligns each function: initiator and voting, final elements, SIL target, proof-test basis.
- 03Marks each field pass, conflict or check.
- 04Flags the conflicts; the engineer confirms and routes changes through management of change.
Output
This animation illustrates the Plexus workflow on a hypothetical plant (ACD). In the product, consistency checks run server-side and every value keeps provenance to its source document; an engineer reviews and SIS changes follow management of change.
Source documents: ACD-SRS-0001 Rev A and ACD-BOD-0001 Rev 0, hypothetical plant
| Safety instrumented function | Initiator (voting) | Final elements | SIL target | Proof test |
|---|---|---|---|---|
| SIF-101Heater overtemperaturesafe state: Fuel isolated, coil protected | ||||
| SIF-102Low hot-oil flowsafe state: No firing without oil flow | ||||
| SIF-103Flame failure / fuel low pressuresafe state: Burner trip (BMS) | ||||
| SIF-104V-301 high pressuresafe state: Feed and reaction heat cut | ||||
| SIF-105T-501 overfillsafe state: Tank inlet isolated | ||||
| SIF-106C-401 high pressuresafe state: Reboiler heat cut | ||||
| SIF-107Reactor overtemperaturesafe state: Feed and heat cut | ||||
| SIF-108T-101 low-low levelsafe state: Pump protection | ||||
| SIF-109T-501 low-low levelsafe state: Pump protection |
Manual: 2-4 hours
With Plexus: 15-30 min review (estimate, nine-function register against the BoD SIS table)