Pick a sample monitoring run
Three hypothetical runs over a 14-day rolling window (2026-04-21 → 2026-05-04) on the same engineering drawings the P&ID Reviewer demo ships with. No alarms have tripped in any of these runs — every signal sits below its configured threshold. This is what Luma surfaces in the quiet zone between nominal and alarm.
DD-10-01 — Feed Preparation · Train 1 · 7-stage compression + interstage cooling
10 signals · 38 tags watched · historian read-only
None of the signals below tripped a configured alarm. Each one is drift Luma flagged before traditional protections would. Per row: the latest transmitter reading in its physical unit, the delta vs the learned baseline, the headroom remaining, and an extrapolated time-to-limit.
Top drifts · last 14 d
3 of 38 watched · worst rate +0.70 kWh/t/d · kWh/t · multivariate
PT-101 / PT-102
C-101 / C-102 interstage
baseline 0.18 bar · alarm L 0.02 bar
Headroom
19% · ~3 d
Drift rate
-0.012 bar/d
TT-401 + multivariate
CW header → E-101…E-106
baseline 22.0 °C · alarm H 28.0 °C
Headroom
77% · ~26 d
Drift rate
+0.18 °C/d
kWh/t · multivariate
Train 1 rollup (C-101…C-104)
baseline 312.0 kWh/t
Headroom
—
Drift rate
+0.70 kWh/t/d
Signal timeline · newest first
04 May
06:48 UTC
WARNINGkWh/t · multivariateon Train 1 rollup (C-101…C-104)Specific power on Train 1 trending +3.2 % over 14 d at constant feed; root cause = E-102 fouling + CW drift + C-104 valve flutter.
RecoCoordinated fix in next 7-d window; expected payback 2.1 d once all three corrected.
322.0 kWh/t
Δ +10.0 kWh/t vs baseline
no alarm threshold
high conf03 May
09:01 UTC
NORMALPT-100on N₂ feed (MX-10-01-80)N₂ feed pressure stable within band — no anomaly across 14-d window.
RecoNo action required.
8.00 bar
Δ 0 bar vs baseline
100% headroom to H alarm
high conf02 May
22:16 UTC
WATCHPT-103 + TT-103on C-103 (recip compressor)Pattern matches 2025-09 valve-plate-wear precursor on C-103: PT lagging TT by 38 min, dP narrowing.
RecoBorescope C-103 cylinder at next opportunity; pre-stage valve kit.
23.40 bar
Δ -0.60 bar vs baseline
80% headroom · ~48 d to L alarm
medium conf01 May
17:44 UTC
WARNINGTT-401 + multivariateon CW header → E-101…E-106CW supply T now +1.4 °C above 14-d baseline; co-trends with all E-1xx hot-side outlets — affects every exchanger duty in feed-prep.
RecoEngage cooling-tower OEM service; check basin makeup, fan pitch, fill condition.
23.4 °C
Δ +1.4 °C vs baseline
77% headroom · ~26 d to H alarm
high conf30 Apr
02:31 UTC
WATCHTT-105 / TT-106on E-105 (interstage cooler)C-105 outlet hotter than C-106 inlet by 1.4 °C — interstage cooling drift on E-105, likely tube fouling on process side.
RecoRe-route flow to spare bank if available; trend interstage dT across next 48 h.
1.4 °C
Δ +1.2 °C vs baseline
57% headroom · ~14 d to H alarm
medium conf28 Apr
14:22 UTC
WARNINGPT-101 / PT-102on C-101 / C-102 interstageInterstage dP variance collapsed from ±0.18 → ±0.05 bar — pulsation dampener saturating; combined with rising suction T → −2.1 % stage efficiency.
RecoVerify nitrogen precharge on dampener bottles for C-101 and C-102; test pulsation profile under no-load.
0.05 bar
Δ -0.13 bar vs baseline
19% headroom · ~3 d to L alarm
high conf26 Apr
08:55 UTC
WATCHTT-102on E-102 process outletHot-side outlet T creeping +0.6 °C / 3 d while CW supply (TT-401) flat — incipient shell-side fouling on E-102.
RecoSchedule CW-side cleaning of E-102 in next maintenance window; budget 6 h.
79.0 °C
Δ +1.0 °C vs baseline
94% headroom · ~80 d to H alarm
high conf25 Apr
19:08 UTC
WATCHTT-104on C-104 (recip compressor)Discharge T drift +1.8 °C over 96 h while suction T flat — early cylinder valve flutter pattern (matches 2025-Q4 precursor).
RecoSchedule valve-plate borescope inspection in next 24 h slot; pre-stage valve kit for C-104.
90.4 °C
Δ +2.4 °C vs baseline
80% headroom · ~21 d to H alarm
medium conf23 Apr
11:42 UTC
WATCHTT-100on Thermal-oil supply (E-101)TO supply T trending −0.4 °C/day vs. heater duty held constant — coil fouling or burner air-fuel drift forming.
RecoInspect heater coil for soot/scale; verify burner trim against last commissioning report.
215.6 °C
Δ -4.4 °C vs baseline
82% headroom · ~51 d to L alarm
medium conf22 Apr
03:14 UTC
WATCHTT-401on CW supply headerCW supply temperature drifted +0.6 °C overnight; cooling-tower performance walking off the 30-day baseline.
RecoVerify tower fan pitch and basin makeup; trend approach temperature at E-101…E-106 over next 48 h.
22.6 °C
Δ +0.6 °C vs baseline
90% headroom · ~14 d to H alarm
medium conf