Luma Process Intelligence — Drift Monitor

ProcessEngineer.io · Quiet-zone monitoring demo

Demo← Back to product

Pick a sample monitoring run

Three hypothetical runs over a 14-day rolling window (2026-04-21 2026-05-04) on the same engineering drawings the P&ID Reviewer demo ships with. No alarms have tripped in any of these runs — every signal sits below its configured threshold. This is what Luma surfaces in the quiet zone between nominal and alarm.

DD-10-01Feed Preparation · Train 1 · 7-stage compression + interstage cooling

10 signals · 38 tags watched · historian read-only

Window21 Apr → 04 May
Spanrolling 14 days
Watched tags38
Run statusWARNING
HistorianPI-System
Accessread-only
Quiet zone

None of the signals below tripped a configured alarm. Each one is drift Luma flagged before traditional protections would. Per row: the latest transmitter reading in its physical unit, the delta vs the learned baseline, the headroom remaining, and an extrapolated time-to-limit.

Top drifts · last 14 d

3 of 38 watched · worst rate +0.70 kWh/t/d · kWh/t · multivariate

PT-101 / PT-102

C-101 / C-102 interstage

WARNING
0.05bar-0.13 bar

baseline 0.18 bar · alarm L 0.02 bar

0.340.180.02
Apr 21Apr 28May 04

Headroom

19% · ~3 d

Drift rate

-0.012 bar/d

TT-401 + multivariate

CW header → E-101…E-106

WARNING
23.4°C+1.4 °C

baseline 22.0 °C · alarm H 28.0 °C

28.022.016.0
Apr 21Apr 28May 04

Headroom

77% · ~26 d

Drift rate

+0.18 °C/d

kWh/t · multivariate

Train 1 rollup (C-101…C-104)

WARNING
322.0kWh/t+10.0 kWh/t

baseline 312.0 kWh/t

312.0302.4
Apr 21Apr 28May 04

Headroom

Drift rate

+0.70 kWh/t/d

Signal timeline · newest first

  1. 04 May

    06:48 UTC

    WARNING
    kWh/t · multivariateon Train 1 rollup (C-101…C-104)

    Specific power on Train 1 trending +3.2 % over 14 d at constant feed; root cause = E-102 fouling + CW drift + C-104 valve flutter.

    RecoCoordinated fix in next 7-d window; expected payback 2.1 d once all three corrected.

    322.0 kWh/t

    Δ +10.0 kWh/t vs baseline

    no alarm threshold

    high conf
  2. 03 May

    09:01 UTC

    NORMAL
    PT-100on N₂ feed (MX-10-01-80)

    N₂ feed pressure stable within band — no anomaly across 14-d window.

    RecoNo action required.

    8.00 bar

    Δ 0 bar vs baseline

    100% headroom to H alarm

    high conf
  3. 02 May

    22:16 UTC

    WATCH
    PT-103 + TT-103on C-103 (recip compressor)

    Pattern matches 2025-09 valve-plate-wear precursor on C-103: PT lagging TT by 38 min, dP narrowing.

    RecoBorescope C-103 cylinder at next opportunity; pre-stage valve kit.

    23.40 bar

    Δ -0.60 bar vs baseline

    80% headroom · ~48 d to L alarm

    medium conf
  4. 01 May

    17:44 UTC

    WARNING
    TT-401 + multivariateon CW header → E-101…E-106

    CW supply T now +1.4 °C above 14-d baseline; co-trends with all E-1xx hot-side outlets — affects every exchanger duty in feed-prep.

    RecoEngage cooling-tower OEM service; check basin makeup, fan pitch, fill condition.

    23.4 °C

    Δ +1.4 °C vs baseline

    77% headroom · ~26 d to H alarm

    high conf
  5. 30 Apr

    02:31 UTC

    WATCH
    TT-105 / TT-106on E-105 (interstage cooler)

    C-105 outlet hotter than C-106 inlet by 1.4 °C — interstage cooling drift on E-105, likely tube fouling on process side.

    RecoRe-route flow to spare bank if available; trend interstage dT across next 48 h.

    1.4 °C

    Δ +1.2 °C vs baseline

    57% headroom · ~14 d to H alarm

    medium conf
  6. 28 Apr

    14:22 UTC

    WARNING
    PT-101 / PT-102on C-101 / C-102 interstage

    Interstage dP variance collapsed from ±0.18 → ±0.05 bar — pulsation dampener saturating; combined with rising suction T → −2.1 % stage efficiency.

    RecoVerify nitrogen precharge on dampener bottles for C-101 and C-102; test pulsation profile under no-load.

    0.05 bar

    Δ -0.13 bar vs baseline

    19% headroom · ~3 d to L alarm

    high conf
  7. 26 Apr

    08:55 UTC

    WATCH
    TT-102on E-102 process outlet

    Hot-side outlet T creeping +0.6 °C / 3 d while CW supply (TT-401) flat — incipient shell-side fouling on E-102.

    RecoSchedule CW-side cleaning of E-102 in next maintenance window; budget 6 h.

    79.0 °C

    Δ +1.0 °C vs baseline

    94% headroom · ~80 d to H alarm

    high conf
  8. 25 Apr

    19:08 UTC

    WATCH
    TT-104on C-104 (recip compressor)

    Discharge T drift +1.8 °C over 96 h while suction T flat — early cylinder valve flutter pattern (matches 2025-Q4 precursor).

    RecoSchedule valve-plate borescope inspection in next 24 h slot; pre-stage valve kit for C-104.

    90.4 °C

    Δ +2.4 °C vs baseline

    80% headroom · ~21 d to H alarm

    medium conf
  9. 23 Apr

    11:42 UTC

    WATCH
    TT-100on Thermal-oil supply (E-101)

    TO supply T trending −0.4 °C/day vs. heater duty held constant — coil fouling or burner air-fuel drift forming.

    RecoInspect heater coil for soot/scale; verify burner trim against last commissioning report.

    215.6 °C

    Δ -4.4 °C vs baseline

    82% headroom · ~51 d to L alarm

    medium conf
  10. 22 Apr

    03:14 UTC

    WATCH
    TT-401on CW supply header

    CW supply temperature drifted +0.6 °C overnight; cooling-tower performance walking off the 30-day baseline.

    RecoVerify tower fan pitch and basin makeup; trend approach temperature at E-101…E-106 over next 48 h.

    22.6 °C

    Δ +0.6 °C vs baseline

    90% headroom · ~14 d to H alarm

    medium conf